New treatment plants
Installation of package sewage treatment plants for off-mains properties.
AFS installs sewage treatment plants for homes, rural properties, estates, farms, hospitality premises, managed sites and developments that need a new or replacement off-mains wastewater system.
A treatment plant installation must be correctly specified, installed and connected to avoid compliance issues, odours, poor discharge or future breakdowns.
Alton Facility Services installs domestic and commercial sewage treatment plants across Hampshire, Surrey, West Sussex and nearby areas. We support rural homes, estates, farms, commercial sites and development projects requiring private drainage.
Works may include excavation, plant installation, inlet and outlet drainage, final effluent discharge arrangements, drainage field or watercourse connections, electrical coordination, commissioning and reinstatement.
We can advise where an existing septic tank needs replacement because it is non-compliant, failing, discharging incorrectly or unsuitable for the property usage.
Each site is different. We check ground conditions, levels, access, discharge route and power. We also consider tanker access, building control and environmental requirements.
Installation of package sewage treatment plants for off-mains properties.
Upgrade from old septic tanks to compliant sewage treatment systems.
Excavation, pipework, chambers, discharge routes and reinstatement.
We assess levels, access, discharge route, existing drainage and likely plant position.
We advise on the practical installation scope and provide a clear quotation.
AFS installs the plant, connects drainage and completes practical handover checks.
The correct system depends on the property, usage and discharge route.
A sewage treatment plant may be suitable when a septic tank is no longer compliant. It can also improve discharge quality or support a new off-mains system.
The installation must consider population equivalent, ground conditions, discharge consent or General Binding Rules, drainage field suitability, maintenance access and tanker emptying access.
AFS combines drainage knowledge with civils and installation experience.
The physical installation often involves excavation, tank bedding, anchoring where needed, backfill, inlet drainage, outlet pipework, inspection chambers and reinstatement.
Once installed, the plant needs commissioning and future servicing. A poorly installed treatment plant can suffer from settlement, poor falls, ingress, flooding, poor discharge quality or repeated alarms.
Completed AFS works showing treatment-system installation, excavation, connected drainage and discharge infrastructure.
New non-electric treatment system installed during the Oxted wastewater upgrade.
Excavation and drainage work forming part of the Oxted installation.
Automatic pump chamber connected to an existing treatment-plant discharge in the New Forest.
A new plant may be needed when a property has no mains drainage connection. It may also be required when an old septic tank is failing or no longer compliant.
We first review the property, expected flows, ground conditions and discharge route. This helps us recommend a system that is practical to install and maintain.
AFS can also support septic tank conversion, treatment plant maintenance and tanker services.
Good access is important after installation. The plant must be serviceable, and a tanker must be able to reach the system when desludging is required.
Call 01420 561661 or use the enquiry form to discuss the property, postcode and existing drainage.
Work our engineers and crews have finished recently, from our own job updates.
Replacement Sewage Treatment Plant Installation Completed in Farnham
Klargester BioDisc Component Repair in Shepperton
Treatment Plant Service in Liphook Finds Split Diaphragms
We cover about 50 miles around Alton. Type the first part of your postcode and we will tell you the nearest town we cover, how far it is from Alton and whether it is inside our area.
Contains OS data © Crown copyright and database right 2026
Contains Royal Mail data © Royal Mail copyright and database right 2026
Contains National Statistics data © Crown copyright and database right 2026
Explore local installation information for homes, estates, commercial sites and off-mains properties across our principal coverage areas.
Send the details through and a member of the AFS team will come back to you.
Yes. AFS can advise on replacement of old or non-compliant septic tanks with suitable treatment plant systems.
Yes. We can undertake the groundworks, tank installation, pipework, chambers and reinstatement as part of the installation scope.
Yes. Treatment plants need routine maintenance to keep the biological process and mechanical components working correctly.
That depends on the discharge route and site circumstances. We can advise what information is usually needed and when specialist approval may be required.
Cost depends on design flow, ground conditions, excavation depth, access, discharge route, electrical supply, pipework, commissioning and reinstatement. AFS can review the property information and arrange the survey needed for a site-specific proposal.
The installation programme depends on site survey information, permissions, equipment lead time, excavation conditions, weather, access and the discharge arrangement. These stages should be confirmed before a start date is agreed.
Send an enquiry or call the AFS team. We’ll confirm the practical next step and whether a site visit is needed.